By Hexagon | Leica Geosystems

HomeTrendsBuilding ConstructionHow Harvey’s Raises the Bar for As-Built Drawings in...

LASTEST POSTS

How Harvey’s Raises the Bar for As-Built Drawings in Mechanical Engineering

When architects, contractors and homeowners work with an engineer for H.V.A.C., hydronics, plumbing, sheet metal fabrication or other mechanical needs, the documentation of the space and systems is not typically much of a consideration. Schematic drawings have long been the standard, and as long as they (eventually) lead to the correct installation, the format of the drawings is deemed inconsequential. But what if the documentation could be much more? What if the deliverables provided as part of the engineering project could be so high in accuracy and so rich in detail that they eliminate the risk of rework, dramatically accelerate the completion of the project, and fast-track any future modifications?

Harvey’s Engineering, a full-service plumbing and mechanical contractor based in Bozeman, MT, has discovered the key to providing this kind of high-value deliverable. The company uses a building information modeling (BIM) approach that focuses on fabrication. Through as-built digital reconstructions in the form of point clouds, Harvey’s is transforming the entire industry. Watch this interview with Harvey’s Engineering Division Manager Brian Nickel to learn how the Leica BLK360 imaging laser scanner is enabling the company to establish a new era of engineering design.

Most Read

LASTEST POSTS

RELATED ARTICLES

New Industry Partnership Leverages Digital Twin to Optimize Building Operations

Vast amounts of data are created during the design, construction, and lifecycle of a building. Much of this information ends up in silos and...

MDB Finds a Competitive Edge in Public Works Construction with the Right Technology Partners

“We’ve been very successful at getting our models to work with the Leica system. The guys love it, and I don't think our D6...

How to Gain an Advantage in Your MEP Existing Conditions Documentation Workflow

Imagine your firm is asked to submit a bid to modernize the MEP systems of a 10-story institutional building. Floors one and two are...
WordPress Lightbox